Pequannock Plant Roof Replacement

Project Name: Pequannock water treatment plant- Roof

Construction: 2020-2021

Design Engineer: PCI Engineers

Contractor: Mak Group

Location: Pequannock Water Treatment Plant

Cost: $1,500,000.00

Project Summary: The roof at Pequannock water treatment plant was leaking, so the City replaced the gravel filled roof with a TPO roof. This improves weather protection for the building and prevents leaks in the future. This project protects both the integrity of the building and the equipment in the plant.