Valley Road Corrosion Control Phase 1 Improvements
Project Name: Valley Road Corrosion Control Chemical Feed System Phase I Improvements
Construction: 2019
Design Engineer: CDM Smith
Contractor: Hutton
Location: Montclair Township
Project Summary: A brand-new corrosion inhibitor, zinc orthophosphate, was introduced at the Montclair booster station in May of 2019. This was the first project to remediate the rising lead levels in the City’s drinking water, which were due to the 18,000 plus lead service lines in the system. The zinc orthophosphate forms a barrier on the inner coating of the pipe thus stopping the leeching of lead into the drinking water.